MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc., This news data comes from:http://bx-eys-xbf-sjol.771bg.com
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.

"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
- Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam
- Marcos lauds Alex Eala’s win in Guadalajara
- Thai cannabis-championing tycoon takes office as PM
- Israel ups pressure on Gaza City as Trump talks post-war plan
- Marcos expresses support for ‘beleaguered’ Cabinet members
- AFP: It would take more than a tugboat to tow BRP Sierra Madre from Ayungin Shoal
- DPWH opens foreign-assisted projects to LGUs
- No peace without end to hostilities –Arab bloc
- 'New' position being offered to Torre — Palace
- Sara mum, but brother thinks Torre removal due to PNP's 'internal conflicts'